top of page

Technical Report 3

Technical report 3 reflects the feedback from the PACE Roundtable event.  This report also includes a summary of the event. Additionally, this assignment has feedback from the project manager and project specific information concerning BIM implementation and sustainability.  

EVENT

My Hip Event, MM/DD/YY

Describe your event here and generate buzz. Where's it happening, and when does it start?

  • Note: While great efforts have been taken to provide accurate and complete information on the pages of CPEP, please be aware that the information contained herewith is considered a work‐in progress for this thesis project. Modifications and changes related to the original building designs and construction methodologies for this senior thesis project are solely the interpretation of Neil Wysocki. Changes and discrepancies in no way imply that the original design contained errors or was flawed. Differing assumptions, code references, requirements, and methodologies have been incorporated into this thesis project; therefore, investigation results may vary from the original design.

bottom of page